Lab Objective:
The objective of this lab exercise is to enable PPP encapsulation on Cisco router Serial interfaces and verify the state of the PPP-encapsulated interfaces. This lab also covers debugging PPP links to see the different states of PPP negotiation


Lab Purpose:
PPP configuration and verification is a fundamental skill. PPP is one of the most popular Layer 2 protocols used on WANs. As a Cisco engineer, as well as in the Cisco CCNA exam, you will be expected to know how to configure and verify PPP encapsulation.

Certification Level:
This lab is suitable for both ICND2 and CCNA certification exam preparation.

Lab Difficulty:
This lab has a difficulty rating of 4/10.

Readiness Assessment:
When you are ready for your certification exam, you should complete this lab in no more than 10 minutes.


Lab Topology:
Please use the following topology to complete this lab exercise:




Task 1:
Configure hostnames on R1 and R2 as illustrated in the topology.

Task 2:
Enable Serial interfaces on R1 and R2. The Serial0/0 interface on R2 is identified as the DCE in the topology. Use the appropriate show command to verify that this interface is indeed the DCE. Configure the DCE interface on R2 to provide clocking to R1. The clock speed should be 512 Kbps. Verify that R1 receives clocking information from R2.

Task 3:
Enable PPP encapsulation on R1 and R2 Seriaol0/0 interfaces. Configure IP addressing on R1 and R2 Serial0/0 interfaces as illustrated in the topology. Verify your interface encapsulation, which should now be PPP. Test connectivity between R1 and R2 by pinging between the routers over the PPP link.


Task 4:
Enable PPP link negotiation debugging on R1. Next, issue the shutdown command, followed by the no shutdown command on Serial0/0. As the interface goes down and comes back up, you should see the different phases of PPP link negotiation. Disable debugging when you are done.

Configuration and Verification
Task 1:
For reference information on configuring hostnames, please refer to earlier labs.

Task 2:
For reference information on verifying DTE/DCE status, please refer to earlier labs.

Task 3:
R1#conf t
Enter configuration commands, one per line.End with CTRL/Z.
R1(config)#int s0/2
R1(config-if)#encapsulation ppp
R1(config-if)#ip address 10.0.254.1 255.255.255.240
R1(config-if)#^Z
R1#

R2#conf t
Enter configuration commands, one per line.End with CTRL/Z.
R2(config)#interface s0/0
R2(config-if)#encapsulation ppp
R2(config-if)#ip add 10.0.254.2 255.255.255.240
R2(config-if)#end
R2#

R1#show interfaces s0/0
Serial0/0 is up, line protocol is up
Hardware is PowerQUICC Serial
Internet address is 10.0.254.1/28
MTU 1500 bytes, BW 1544 Kbit, DLY 20000 usec, reliability 255/255, txload 1/255, rxload 1/255   
Encapsulation PPP, LCP Open
Open: IPCP, CDPCP, loopback not set
Keepalive set (10 sec)

R1#ping 10.0.254.2

Type escape sequence to abort.
Sending 5, 100-byte ICMP Echos to 10.0.254.2, timeout is 2 seconds:
!!!!!
Success rate is 100 percent (5/5), round-trip min/avg/max = 4/5/8 ms
Task 4:
R1#debug ppp negotiation
PPP protocol negotiation debugging is on
R1#conf ter
Enter configuration commands, one per line.End with CNTL/Z.
R1(config)#int s0/0
R1(config-if)#shut
*Mar1 02:00:08.949: %LINK-5-CHANGED: Interface Serial0/0, changed state to administratively down
*Mar1 02:00:08.949: Se0/0 PPP: Sending Acct Event id
*Mar1 02:00:08.949: Se0/0 CDPCP: State is Closed
*Mar1 02:00:08.949: Se0/0 IPCP: State is Closed
*Mar1 02:00:08.953: Se0/0 PPP: Phase is TERMINATING
*Mar1 02:00:08.953: Se0/0 LCP: State is Closed
*Mar1 02:00:08.953: Se0/0 PPP: Phase is DOWN
*Mar1 02:00:08.953: Se0/0 IPCP: Remove route to 10.0.254.2
*Mar1 02:00:09.951: %LINEPROTO-5-UPDOWN: Line protocol on Interface Serial0/0, changed state to down

R1(config-if)#no shut
*Mar1 02:00:14.746: Se0/0 PPP: Outbound cdp packet dropped
*Mar1 02:00:16.746: %LINK-3-UPDOWN: Interface Serial0/0, changed state to up
*Mar1 02:00:16.746: Se0/0 PPP: Using default call direction
*Mar1 02:00:16.746: Se0/0 PPP: Treating connection as a dedicated line
*Mar1 02:00:16.746: Se0/0 PPP: Session handle Session id
*Mar1 02:00:16.746: Se0/0 PPP: Phase is ESTABLISHING, Active Open
*Mar1 02:00:16.750: Se0/0 LCP: O CONFREQ id 22 len 10
*Mar1 02:00:16.750: Se0/0 LCP:    MagicNumber 0x05CC8E89 (0x050605CC8E89)
*Mar1 02:00:16.750: Se0/0 LCP: I CONFREQ id 2 len 10
*Mar1 02:00:16.750: Se0/0 LCP:    MagicNumber 0x052E783E (0x0506052E783E)
*Mar1 02:00:16.754: Se0/0 LCP: O CONFACK id 2 len 10
*Mar1 02:00:16.754: Se0/0 LCP:    MagicNumber 0x052E783E (0x0506052E783E)
*Mar1 02:00:16.754: Se0/0 LCP: I CONFACK id 22 len 10
*Mar1 02:00:16.754: Se0/0 LCP:    MagicNumber 0x05CC8E89 (0x050605CC8E89)
*Mar1 02:00:16.754: Se0/0 LCP: State is Open
*Mar1 02:00:16.758: Se0/0 PPP: Phase is FORWARDING, Attempting Forward
*Mar1 02:00:16.758: Se0/0 PPP: Queue IPCP code id
*Mar1 02:00:16.758: Se0/0 PPP: Discarded CDPCP code id
*Mar1 02:00:16.762: Se0/0 PPP: Phase is ESTABLISHING, Finish LCP
*Mar1 02:00:16.762: Se0/0 PPP: Phase is UP
*Mar1 02:00:16.762: Se0/0 IPCP: O CONFREQ id 1 len 10
*Mar1 02:00:16.762: Se0/0 IPCP:    Address 10.0.254.1
*Mar1 02:00:16.774: Se0/0 IPCP: State is Open
*Mar1 02:00:16.778: Se0/0 IPCP: Install route to 10.0.254.2
*Mar1 02:00:17.763: %LINEPROTO-5-UPDOWN: Line protocol on Interface Serial0/0, changed state to up
*Mar1 02:00:18.741: Se0/0 CDPCP: I CONFREQ id 2 len 4
*Mar1 02:00:18.741: Se0/0 CDPCP: O CONFACK id 2 len 4
*Mar1 02:00:18.741: Se0/0 CDPCP: State is Open
R1(config-if)#end
*Mar1 02:00:25.777: %SYS-5-CONFIG_I: Configured from console by console
R1#undebug all
All possible debugging has been turned off



来源: CCNA LAB90: Configuring EIGRP for IPv6
来源: CCNA LAB 91: Configuring Back-to-Back Serial Connections
来源: CCNA LAB92: Verifying Cisco HDLC Encapsulation

lxzhanshe 发表于 2023-3-17 14:03:40

谢谢楼主分享!

新野 发表于 2023-3-21 16:25:43

看看,谢谢!!!

lxzhanshe 发表于 2023-3-27 15:34:38

谢谢分享

welinker448 发表于 2025-3-12 23:29:09

{:6_267:}{:6_267:}{:6_267:}{:6_267:}
页: [1]
查看完整版本: CCNA LAB 93: Configuring PPP Encapsulation